After our April 12 WebAPI meeting, the following schedule was prepared, estimating when various APIs will be documented.
We are documenting these APIs in phases as described below.
Contents
Phase 1: Basic Coverage for All APIs
The first phase involves having basic content with a brief summary for each API, as well as complete reference material for all of the APIs not already documented. This phase should be completed by the end of April. Outline of the order in which writing will be done, and estimates for completion dates per API.
API | Estimated completion date | Notes |
---|---|---|
Proximity API | April 17 | Done |
Time/Clock API | April 17 | Done |
WebFM API | April 18 | Done |
TCP Socket API | April 18 | Done |
Contacts API | April 19 | Done |
Settings API | April 19 | Done |
Idle API | April 24 | Done (complete) |
Web Bluetooth | April 27 | Assuming the API is stable enough, which it should be. Planning to work on this during the Vancouver doc sprint. |
Permissions API | April 27 | Done |
Mobile Connection API | April 27 | Done |
Power Management API | April 27 | Done (complete) |
Network Stats API | April 27 | Done |
WiFi Information API | ??? | Depends on the implementation status, which is not currently known. |
Phase 2: Full documentation for all content-accessible APIs
The next phase is to fully-document all APIs accessible from unprivileged apps. This means having complete how-to documentation, as well as examples. These should be finished by the end of May.
Note: The contractor doing the majority of the writing is on PTO from April 29 to May 13.
API | Estimated completion date | Notes |
---|---|---|
Ambient Light Events | April 27 | Done |
Proximity Events | May 15/16 | Done |
Screen Orientation | May 22/23 | Both Screen Orientation and Device Orientation |
Battery Status | May 23/24 | Done. |
Alarm API | May 24 | Done. |
Time/Clock API | May 29/30 | Done |
WebFM API | May 30/31 | Done |
Phase 3: Full documentation for all Certified APIs
By the end of June, we should have complete documentation for all stable certified APIs.
API | Estimated completion date | Notes |
---|---|---|
Device Storage API | June 5/6 | Done but we need to document some related API such as FileHandle. |
TCP Socket API | June 6/7 | Done |
Browser API | June 12/14 | Done |
Contacts API | June 19/21 | Done |
WebSMS | June 26 | Done (There are still things missing but the API is far from stable, so not sure it worth the effort to go deeper) |
WebTelephony | June 26 | Done |
Settings API | June 26 | Done |
Web Bluetooth API | June 27/28 |
At this point, our contractor's contract will expire, and what happens from there out is theoretical, but we are in good shape if we hold to this schedule.
Phase 4: In-depth tutorials
Once basic documentation is complete by the end of June, we would like to proceed to write more in-depth tutorials for the most important APIs, as well as to show better how to use them together, as well as in concert with Firefox OS UX building blocks as appropriate.
However, we do not currently have resources allocated for this work. That said, we hope to hire a writer in time to have them do this work.