QA/StaffMeetings/QA-Staff-06-22-2011
From MozillaWiki
< QA | StaffMeetings
<a href="QA/StaffMeetings/QA-Staff-06-08-2011">« previous mtg</a> | <a href="QA/StaffMeetings">QA Staff Home</a> | <a href="QA/StaffMeetings/QA-Staff-07-06-2011">next mtg »</a>
Contents
QA Staff Meeting Notes June 22, 2011
New Hires
- Welcome James Bonacci!
Vacation Calendar for June
- Matt: May 28- June 18
- Tracy: June 10
- Henrik: June 24
- Stephen: June 29th - July 8th
- Aakash: June 17-20
- Naoki: June 30 - July 5
- Dave Hunt: June 7-14
- Vishal: Friday, June 10
- Al and Rebecca (not pto, work remotely): June 27 - July 1
Upcoming Test Events
- Mobile Testday (Friday, June 24th)
- Congratulations to Stephanie Daugherty for winning the testing challenge from Lanette Creamer's talk last week.
Project Status
- Overview (2 min brief update)
Desktop Firefox (Juan)
- Firefox Next: Fx5 shipped, monitoring stability. Nightly-Aurora-Beta merge next week or so.
- CrashKill
- <a href="https://wiki.mozilla.org/Platform/2011-06-21#Stability_Report">Stability Report</a>
- <a href="https://crash-analysis.mozilla.com/chofmann/">Entire directory drilled down by versions</a>
- CrashKill
Maintenance and Security (Al)
- Firefox 3.6.18 is out.
- Firefox 3.6.19 to ship with Firefox 6*.
- Firefox 3.6.x end of life (EOL) meeting next week, probably on Wednesday morning at 10:00 AM.
- Christian will send proposed time later today.
*Unless we don't do Firefox 3.6.19
Browser Technologies (Tony)
- Fennec (aakash)
- Sync (Tracy)
- python sync server in the works
- both client and server trains back on track. first pieces of instant sync merged to m-c
- Load Testing (Owen)
- See under QA Automation below
- Test pilot (tracy)
- release New Tab study
- Identity (tracy)
- passing this on to James
- Firefox Home (nhirata)
- Testing has been moved to bugzilla
- No plans to have flight tracking page until there's more than 1 ~ 2 developers
- https://wiki.mozilla.org/Home/Roadmap
- UI Concepts : https://wiki.mozilla.org/Home/Features/ux
- Plans to get RSS feature in
WebQA (Stephen)
AMO
- <a href="http://tinyurl.com/5sgwkee">AMO 6.1.1</a> went live 06/16
- <a href="http://tinyurl.com/68nesms">AMO 6.1.2</a> is scheduled to go live on 06/23
=== Add-on Builder (FlightDeck)
- Shipped https://builder.addons.mozilla.org/ on 6/21/11 @7am
Engagement Projects
- <a href="https://bugzilla.mozilla.org/show_bug.cgi?id=628811">Mark Up</a> dark launched on 6/7, snippets push on 6/9
Input
- Push <a href="http://goo.gl/Hi6Hj">4.0.3/4.1 milestone</a> 6/8
- Scheduled <a href="http://goo.gl/A8rNV">4.2 milestone</a> 6/28
Mozilla.com
- <a href="http://bit.ly/ji8J3R">shipped</a> Firefox 5 Release
MDN
- Shipped <a href="https://bugzilla.mozilla.org/show_bug.cgi?id=665053">0.9.6.1</a> 6/21/2011
Socorro
- <a href="https://bugzilla.mozilla.org/show_bug.cgi?id=661159">1.7.8 milestone</a> pushed 6/2
- <a href="http://goo.gl/GZg34">2.0 milestone</a> slated for 6/28
SUMO
- <a href="http://moxie.jamessocol.com/bugstats/sumo/2011-06-14">SUMO 06-14</a> released
- <a href="http://moxie.jamessocol.com/bugstats/sumo/2011-06-16">SUMO 06-16</a> released
- <a href="http://moxie.jamessocol.com/bugstats/sumo/2011-06-21">SUMO 06-21</a> released
- <a href="http://moxie.jamessocol.com/bugstats/sumo/2011-06-28">SUMO 06-28</a> under test, tbr next Tuesday
WebQA Automation
AMO
- Still working through Code reviews. Are still getting pull requests from Waverly
- Merge of addon details page object imminent
Input
- Still working through code reviews. Are still getting pull requests from Waverly.
MDN
Mozilla.com
Socorro
- We're going to move one of the Waverly resources to the project.
SUMO
- Migrated tests to use <a href="https://github.com/mozilla/sumo-tests">pytest</a>
Community (Marcia)
- There is now a bi-weekly Contribute Group meeting.
- The Contribute Group is a forum for discussing ideas, questions, concerns or anything else about bringing new people into Mozilla.
- Meeting time: Every other Thursday at 10 AM PDT
- Dial-in information: 1-800-707-2533, pin: 369, conf: 634
- Back channel: irc.mozilla.org#mozillians
- Agenda: https://wiki.mozilla.org/Mozilla.org/Contribute#Meetings
- The Contribute Group is a forum for discussing ideas, questions, concerns or anything else about bringing new people into Mozilla.
- QMO
- QMO 4.0 should be available to test by EOW.
- Craig is basically done with theme work but Bugzilla plugin contractor isn't quite done (and having issues).
- Should be available for people to review next week.
- Al just got new badge graphic proposals this morning.
- QMO 4.0 should be available to test by EOW.
- There is now a bi-weekly Contribute Group meeting.
Test Automation (Henrik)
General
- In progress of defining Q3 goals
- We have to get in touch with the WebApp folks to define possible Mozmill coverage
Mozmill
- Mozmill 1.5.4b3 has been released which caused a lot of brokenness in our tests due to low level API changes; an updated 1.5.4b4 is planned for today with follow-up fixes from Henrik
Project updates
- <a href="https://wiki.mozilla.org/QA/Mozmill_Test_Automation/Shared_Modules_Refactor">API Refactoring</a> (Geo) </dt>
- Added go to known state before/after tests (robustness)
- Added up to 5 sec implicit wait for finding elements (robustness)
- Identifying key tests for the final run at porting so we can have a repo of samples to ramp people up on
- Mozmill Tests for the Discovery Pane of the Addons Manager (ashughes) </dt>
- All tests ready code-wise, need testing before landing
- Waverley working on Bookmarks, History, and Addons Manager restart tests
- <a href="QA/Mozmill Test Automation/Endurance Tests">Endurance Tests</a> (Dave) </dt>
- Continuing to work on resolving restart issue by moving to events
- <a href="https://wiki.mozilla.org/QA/Mozmill_Test_Automation/On_Demand_Update_Testing">On Demand Updates</a> (Geo) </dt>
- 1.0 version rolled out on qa-* clusters
- Includes cluster selection for parallel testing
- Usage has continued to uncover edge cases in company's Pulse implementation, but overall system is working very well. Stability has increased considerably.
TCM (Cameron/Rebeca)
- Continuing implementation of .4 features
- Updates to the filtering UI to make it more goodly
- On track for FC of .4 on July 15th
- Added Rebecca Billings as my second
- Matt B. and Marlena also helping lots
- Created a "bleeding edge" for dev work on tcm-dev.oddsites.net
- Need fixes to Platform software dependencies.
Events
- Possible QA Automation Services work week early July in Europe
- QA Services Workweek - july 18th - 22nd
Discussion Items
- QA Laptop Bags: Please read the wiki and make your choices: http://mozqa.sync.in/QA-bag-project. The sooner this happens, the faster we will get the bags.
- Litmus Ownership
- Desktop: https://wiki.mozilla.org/QA/Execution/Litmus/Ownership
- Mobile: https://wiki.mozilla.org/QA/Execution/Litmus/Fennec
- Can we just merge the two pages?
- Can we take some time and just go through these line by line?
- Litmus Ownership
- Selenium broken with Firefox 5?
- Some chatter regarding this in the Firefox 11 AM meeting today. Anyone in QA see this? Johnath is point person for this if you have info.
- Project Wiki Page cleanup
- 1st tackle the public wikis
- access to all current project pages and plans
- archive old projects
- create missing project pages
- Target next staff 7/6
- next is the intranet side
- 1st tackle the public wikis
- Q3 goals
- Preliminary Engineering Goals
- Realize Android as a top-tier supported platform alongside Windows, Mac & Linuz
- Implement prioritized list of features required to support Web Apps
- Ship new web developer tool prototype in a release
- Something related to e10s
- Each team will have 3 highlevel goals for Q3
- Preliminary Engineering Goals
- Org announcement to dev
- Feedback on org structure?
- What should be relayed
- Automation Group offsite brainstorm (need only the automation folks for this)
- Date for next QA work week?
Notes, Takeaways and Action Items
Today
- New Hires: James Bonacci will be starting on June 20th
- Vacation: Please update the vacation calendar for June
- Testdays:
- Kevin is running a Mobile testday Friday June 24th
- Project Status
- Browser Technologies: Webapp is looking for QA support. Tony to talk to Stephen about coverage. We may also need to ramp up on Waverley
- WebQA: Markup launched
- Test Automation: TCM will be ready to use/test by .5. Need a list of features to be available to start beta testing (Cameron)
- Discussion items:
- Everyone to update their team/personal goals within two weeks.
- Aaron to post the email regarding how we track fixed and verified bugs in rapid release branch.
- Please remember to do a 'Reply All' when responding to contributor emails.
- Al to set up squid proxy on a VM.