Program Management/Firefox/2013-Q1-Goals
From MozillaWiki
Contents
Firefox Desktop
- Ship FHR in Fx20 GA.
- Define and execute performance projects for start-up and shutdown (Snappy)
- Define and drive implementation of performance metrics
- Support elaboration of platform technical roadmap
Firefox Android
- Features, Releases, and Roadmap
- [DONE] Reinstate Fx Android Program Status to convey recent accomplishments, progress of features compared to roadmap POR, and risk profile around market share initiatives
- [DONE] Reinstate live walk-throughs to showcase features in progress
- [DONE] Collaborate with Product to refine cadence of Product Planning weekly
- [DONE] Fx19, Fx20
- [MISSED] Firefox Android Work Week <== this happened without me but my real work begins, now!
- MWC 2013
- [DONE] Orchestrate delivery of all cross-functional and core-engineering technical requirements to ensure a successful Fx Android Presence at MWC 2013
- [DONE] Converge Readability 2.0: Finalize UX, Engineering, and QA POR and resulting schedule
[DONE] Firefox Metro
- Total Goals: 17
- Completed Goals: 15
- Missed Goals: 2
Project Management
- Deliver full Metro Software Requirements Specification outlining Minimum Viable Product (MVP) features.
- [DONE] Confirmed by Product Manager During Iteration #3
- Integrate QA within development process to test and verify stories as they are completed within an iteration.
- [DONE] QA has been testing stories upon completion since Iteration #2.
- Integrate QA within development process to test and verify entire release build at the end of each iteration.
- [DONE] QA has been testing iteration release builds since Iteration #1.
- Resolve all 'to be planned' stories so they are ready for development in upcoming iterations.
- [MISSED] Was previously completed but a new story requiring planning was added on March 27, 2013. Will be carried over to Q2.
- Reorganize all 'legacy' (pre Iteration #1) stories to conform to the new production framework.
- [DONE] Confirmed by Product Manager During Iteration #2
- Develop Expected Scenario Production Forecast.
- [DONE] Confirmed by Project Manager During Iteration #3
- Resolve the status of all 'legacy' (pre Iteration #1) stories to 'Fixed/Verified' status (QA test conducted and any defects resolved).
- [DONE] Confirmed by Project Manager During Iteration #4
- Modify all 'on hold' stories so they are ready for development in upcoming iterations.
- [MISSED] Not completed during Q1 - 15 items remain to be resolved. Will be carried over to Q2.
Product Development
- Migrate Metro prototype to MC-Nightly.
- [DONE] Achieved During Iteration #2
- Conclude Development Iteration #1 and Deliver Release Build to Product Manager and QA Department.
- [DONE] Iteration #1 Completed
- Conclude Development Iteration #2 and Deliver Release Build to Product Manager and QA Department.
- [DONE] Iteration #2 Completed
- Conclude Development Iteration #3 and Deliver Release Build to Product Manager and QA Department.
- [DONE] Iteration #3 Completed
- Conclude Development Iteration #4 and Deliver Release Build to Product Manager and QA Department.
- [DONE] Iteration #4 Completed
Team Performance
- Iteration #1 - Team completes 20 points of of their committed Feature Stories.
- [DONE] At the conclusion of Iteration #1 the team has surpassed the goal and completed 30 story points.
- Iteration #2 - Team completes 25 points of of their committed Feature Stories.
- [DONE] At the conclusion of Iteration #2 the team has surpassed the goal and completed 32 story points.
- Iteration #3 - Team completes 30 points of of their committed Feature Stories.
- [DONE] At the conclusion of Iteration #3 the team has surpassed the goal and completed 33 story points.
- Iteration #4 - Team completes 35 points of of their committed Feature Stories.
- [DONE] At the conclusion of Iteration #4 the team has surpassed the goal and completed 63 story points.
Firefox OS
Q1-2013
- Deliver to FFOS Roadmap
- FFOS v1 Code Freeze early January
- FFOS Shira Code Freeze February
- FFOS Leo Code Freeze
- Partner Communication Plan
- RACI or Actor profiles identifying R&R for Mozilla plus Partners
- Cross-organizational alignment on communication plan
Q2-2013
- Deliver to FFOS Roadmap
- FFOS v1.0 Launch with TEF & ZTE Q2
- FFOS v1.x (Shira) Launch with DT & TCL Q2
- FFOS v1.x (Leo) Launch with TEF & LG Q3
Mobile Web Compatibility
- Define measurable compatibility projects for 2013
- Hire 2-3 technical/evangelism resources
- Drive Webkit aliasing research
Program/Project Management
- Expand team by 3 people