Platform/Features/WebsocketsUnprefix

From MozillaWiki
Jump to: navigation, search
Please use "Edit with form" above to edit this page.

Status

Unprefixing WebSockets
Stage Complete
Status Complete
Release target `
Health OK
Status note Lots of small stuff left to do here.

Team

Product manager Christopher Blizzard
Directly Responsible Individual Christopher Blizzard
Lead engineer Jason Duell
Security lead `
Privacy lead `
Localization lead `
Accessibility lead `
QA lead `
UX lead `
Product marketing lead `
Operations lead `
Additional members `

Open issues/risks

`

Stage 1: Definition

1. Feature overview

There's a list of things left to do to get WebSockets across the finish line. Some minor API changes, protocol fixes, etc.

2. Users & use cases

`

3. Dependencies

`

4. Requirements

`

Non-goals

`

Stage 2: Design

5. Functional specification

`

6. User experience design

`

Stage 3: Planning

7. Implementation plan

`

8. Reviews

Security review

`

Privacy review

`

Localization review

`

Accessibility

`

Quality Assurance review

`

Operations review

`

Stage 4: Development

9. Implementation

Must Have:

May be required:

Nice to have:

  • 668948 Websockets events happen out of order if client handlers do Sync XHR
  • 677000 Intermittent test_websocket.html - onerror called on test 37!
  • 677316 Intermittent test_websocket.html - test 35b closed cleanly followed by - test 35 custom server code and - test 35 custom server reason sometimes started by - onerror called on test 35
  • 677840 Intermittent TEST-UNEXPECTED-FAIL - /tests/content/base/test/test_websocket.html - application timed out after 330 seconds with no output
  • 684169 Intermittent test_websocket.html - onerror called on test 2!
  • 684290 Intermittent failure in content/base/test/test_websocket_basic.html - Connection closed cleanly
  • 688716 Intermittent test_websocket.html - the ws connection in test 8 should be closed cleanly

Needs info:

  • 691038 Websocket: message not processed on close
  • 691040 Websocket: Improperly constructed message frames

Stage 5: Release

10. Landing criteria

`


Feature details

Priority P1
Rank 999
Theme / Goal `
Roadmap Platform
Secondary roadmap `
Feature list Platform
Project `
Engineering team Networking

Team status notes

  status notes
Products ` `
Engineering ` `
Security ` `
Privacy ` `
Localization ` `
Accessibility ` `
Quality assurance ` `
User experience ` `
Product marketing ` `
Operations ` `