Firefox OS/Comms
Team Backlog
Team back log (including Blockers and Non-blocking backlog)
Priority-wise: Blockers/Regressions > Feature work/Top X > Remaining Bug Backlog
- Dashboard: http://charts.mozilla.org/ffos/blockers.html#responsibility=FxOS_Team&team=Comms
- feature-b2g (http://goo.gl/fgkwAO) , nominations included.
- blocking-b2g+ (http://goo.gl/4h1v2e)
- TopX list (http://goo.gl/DSfngu)
- Smaller chunk of bugs/features that the team can select from if they have no blockers or key focus feature works on their plate. These should have whiteboard tagging as [priority]. Will migrate these to flag tracking-b2g soon.
- blocking-b2g == backlog (http://goo.gl/wxW7fJ)
- TopX list (http://goo.gl/DSfngu)
- Others: Whiteboard with [FT:COMMS] (http://goo.gl/uuGfOO)
To be triaged
What engineering is working on
To have a bug being considered for attention, just set "blocking-b2g: ?". The triage process will decide if it should block a release or be considered for inclusion in that release.
Contacts
- Features: http://goo.gl/dclgBq
- Blockers: http://goo.gl/pFx8uj
- Sub-team meetings
- https://wiki.mozilla.org/Gaia/Contacts/Scrum/2.2S1
- Daily irc/etherpad standup ~ 3:30pm Taipei / 9:30am EU
- Sprint planning on Friday before the team planning
Message
- Features: http://goo.gl/xes5in
- Blockers: http://goo.gl/zTv5UP
- Sub-team meetings
- https://wiki.mozilla.org/Gaia/SMS/Scrum
- Daily irc/etherpad standup ~ 3:45pm Taipei / 9:45am EU
- Sprint planning on Tuesday before the team planning
Dialer
- What are we working on (until June 23 2014)
- https://wiki.mozilla.org/FirefoxOS/Comms/Dialer
- Call Length https://wiki.mozilla.org/Gaia/Comms/2.1/Call_Length
What we'll we work on next, by order of priority:
Sprint planning happens on Mondays at 15h30 Paris/ 9h30 Toronto/ 21h30 Taipei.
Others (Cost control / Wappush)
- Features: http://goo.gl/5j4ORn
- Blockers: http://goo.gl/yvhVWO
For team roles and meeting time, refer to https://etherpad.mozilla.org/comms-subteams
Past Releases
Sprint backlog
2.2 S1 (~12/05)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S2 (~12/19)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S3 (~1/9)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S4 (~1/23)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S5 (~02/06)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S6 (~2/20)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S7 (~3/06)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S8 (~3/20)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S9 (~4/03)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S10 (~4/17)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S11 (~5/01)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
2.2 S12 (~5/15)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Team Backlog
- Tracking-b2g:+ (http://goo.gl/3RzYRR)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
- Tracking-b2g:backlog (http://goo.gl/TdRcK8)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);