Per discussion in team meeting, skip the report for this week. For the report on Aug. 17th, please check next report.
Name
|
Done
|
Plan
|
Alison
|
- Week W33 (08/10~08/14)
- [v2.5 Pin the Web] Confirm scope
- [v2.5 Pin the Web] Spec study
- [v2.5 Pin the Web] Draft test plan - pin site
- Bugs work from QAnalyst/Marigold
- Backup of performance taskforce
|
- Week W34 (08/17~08/21)
- [v2.5 Pin the Web] Spec study
- [v2.5 Pin the Web] Confirm unclear spec with developer/UX
- [v2.5 Pin the Web] Draft test plan - pin page
- [v2.5 Pin the Web] Create test cases
- Bugs work from QAnalyst/Marigold
|
Askeing
|
- Week W33 (08/10~08/14)
- Refactoring the Taskcluster Downloader
- Refactoring the b2g_util (ref release-history)
- new b2g_enable_certapps_devtools
- refatoring check_versions, and backup/restore
- new ADBWrapper design, and new B2GHelper class.
|
- Week W34 (08/17~08/21)
- Refactoring the b2g_util (ref release-history)
- refactoring ADB related classes
- unittest, and travis ci integration
- document creation
- deliver the 0.0.7 version
|
Cynthia
|
- Week W33 (08/10~08/14)
- [v2.5 Bugzilla Lite] Enhance test cases coverage
- [v2.5 Bugzilla Lite] File bugs and verify bugs
- [v2.5 Bugzilla Lite] Help Marigold to setup env for TV testing
- [v2.5 TV Features] Spec study
- [Open Mobile] Verify bugs for ACL-enabling and WhatsApp
|
|
Gerry
|
|
|
Kinder
|
- Week W33 (08/10~08/14)
- [MozTrap]
- Cucumber syntax parsing
- Modify parseCaseversion() in orm.py to skip detect "TEST THAT"
- [WhatsApp on ZTE]
|
- Week W34 (08/17~08/21)
- [MozTrap]
- Git-to-MozTrap
- Parsing value table that case's steps could be generated according to them
- [Smogtest for ZTE]
- Go through the smogtest for ZTE
|
Mike
|
- Week W33 (08/10~08/14)
- PTO 8/10~8/14
|
|
Paul
|
|
|
Shako Ho
|
- Week W33 (08/10~08/14)
- MCTS
- Fixing dep package issue on v2.1
|
|
Shing
|
|
|
Teri
|
- Week W33 (08/10~08/14)
- [V2.5]
- Replaceable Homescreen
- Dev code review+
- Code landed on master ready to test
- TV
- Set up B2G env for TV
- Study spec
- Designed test plan
- [Others]
|
|
Walter
|
- Week W33 (08/10~08/14)
- MCTS future planning and priorizing
- MCTS restruct
- solved dependency issue with Shako
- solved original dependency of GaiaApps in MCTS
- working on filters of MCTS
- MCTS pull requests reviewing
- MozMinions pull request reviewing
|
|
William Hsu
|
- Week W33 (08/10~08/14)
- [Device & OS]
- Follow v2.5 user story
- Bug 1179459 - (rtl-2.5) RTL Support for Firefox OS 2.5
- Sprint 4 retrospect and Sprint 5 planning
- Daily smoketest report (Aries-KK & Flame-KK)
- [Outsourcing]
- Weekly meeting & report
- Tracing Marigold working model and progress
- Tracing fullrun test results and triage fullrun bugs
- [Others]
|
|