Mobile/Planning/2.0
Contents
Objectives
The main focus of Fennec 2.0 is on the platform side of things, focusing on Electrolysis and Layers and on Android integration. We'll continue to make front-end improvements that reflect a shift to more devices with broader capabilities.
Timeline
Important milestones (subject to change):
Alpha 1
- Shipped on August 27, 2010
Beta 1
- Shipped on October 7, 2010
Beta 2
- Shipped on November 4th, 2010
- Code freeze: Oct 19
- Major Requirements:
bug 596755Re-enable YARR on ARMbug 605415 Re-enable MonoICs on ARMPage load improvementsbug 588607Android sizebug 575403New themebug 600103Fonts don't look like crap- Software video (reach?)
- libvpx neon optimizations
bug 511348libtremor integration
Beta 3
- Shipped on December 22, 2010
- Code freeze: Nov 23
- Major Requirements:
- Easy Sync setup
- Crash reporting
- bug 588021 PICs
Beta 4
Top Goals: Performance, Stability, Compatibility, Usability
- Shipped on February 1, 2011
- See scheduling details here: http://bit.ly/ffG6iI
Beta 5
Top Goal: Launch Places changes- detailed schedule: http://bit.ly/ffG6iI
- Feb 15 - Code Freeze
- Feb 17 - Go to build
- Feb 23 - Launch
RC 1
Top Goal: RC “as close as possible to final release”
- Mar 11: Code Freeze, decision to go to build
- Mar 14: “go to build” RC1
- Mar 21 or 22: Launch, review RC1 user feedback
Call RC1 “final”
- Mar 22: Analyze RC feedback, make go/no-go decision
- Mar 29: GA Launch (time frame depends on user feedback)
RC 2 (if required)
Those dates are subject to change, as they depend on user feedback and severity of bugs from RC1
Top Goal: RC2 “fixing only major bugs from RC1”
- Mar 21: Start fixing severe bugs (only)
- Mar 24: Complete bug fixing, tests and go to build
- Mar 28: RC2 launch
- Mar 30: GA launch
Projects
List of projects for Fennec 2.0
Front-end:
Description | Priority | Status | Details | Strings | Bugs |
Multitouch | P1 | LANDED | details | yes | |
Virtual keyboard | P1 | LANDED | details | no | |
Sync integration | P1 | LANDED | details | yes | |
Logging in to websites easier (need to be more specific) | P3 | Moved to 4.1 | |
yes | |
Contacts integration | P2 | LANDED | details | no | |
|
|
|
|
|
|
AwesomeScreen redesign | P1 | LANDED | details | yes | |
Find in page | P3 | LANDED | details | yes | |
Sharing | P2 | LANDED | details | yes | |
Platform integration (notification systems, back button, helper apps) | P1 | LANDED | details | yes | |
Session Store & Undo Tab Close | P4 | LANDED | details | no | |
Feedback and Help | P3 | LANDED | details | yes | |
UI Transitions/animations (zooming, sliding panels, fade in/out, elastic edges) | P3 | Moved to 4.1 | |
no | |
Page interactions (direct use and/or cursor mode) | P1 | Moved to 4.1 | details | no | |
Scroll indicators (content and chrome) | P2 | LANDED | details | no | |
|
|
|
|
|
|
Better error pages | P4 | Moved to 4.1 | details | yes | |
Mobilize our messages/dialogs | P4 | Moved to 4.1 | details | yes | |
Form Assistant refresh | P2 | LANDED | details | no | |
RTL support | P1 | LANDED | details | no | |
Basic RSS support | P3 | Moved to 4.1 | details | yes | |
Basic webapp support | P4 | Moved to 4.1 | details | yes | |
Android chrome theme | P1 | LANDED | details | yes | |
Camera UI | P3 | Moved to 4.1 | details | yes | |
Reflow on zoom | P3 | LANDED | details | no | |
Remove TileManager from Frontend | P1 | LANDED | details | no | |
Master Password | P4 | Moved to 4.1 | details | yes | |
Updater | P1 | LANDED | details | yes | |
Platform:
Description | Priority | Status | Details | Strings | Bugs |
Electrolysis | P1 | INFLIGHT | details notes | no | |
Layers | P1 | LANDED | notes | no | |
Power Management | P1 | LANDED | |
no | |
QT Widget | |
LANDED | |
|
|
Plugins | |
RUNWAY | |
|
#630007 |
Video (and UI) | |
LANDED | |
|
|
Camera (and UI) | |
Moved to 4.1 | |
|
|
Status Legend:
- RUNWAY - Waiting for design or initial planning
- TAKEOFF - Ready for work to begin
- INFLIGHT - Work is in progress. Patches should be in bugs.
- LANDED - Work has finished and is in the product.
See the projects page for the list of all potential projects.